Main Problems
Mainly in off-grid systems, due to complex operating
conditions, the battery will run out of power until it
shuts down. The customer needs to power on the
batteries manually.
Solutions
With our products, the customer only needs to
check the inverter battery automatic start option.
When the photovoltaic or grid starts the inverter
again, the BAT port of the inverter will output a
voltage of about 48V in a short time, and this
voltage will act as the start of the BMS.